About
us Products Services Contact Our
Blog Security Forces Motorsports News & Events
7 Man Made Mega
Sea Whirlpool Vortex can be installed on Singapore Shipping Route Blockage
during outbreak of wars.
Man Made Mega Sea Whirlpool
Vortex Submerged Structure had been developed.
|
Plan View - Fully Submerged Whirlpool Caisson Walls
Structure build up on seabed 50m tall, 1.5 km wide & centre
of curve wall has a 300m wide channel and added red top gate 25m depth which
allow vortex to form when it seal up half of the
blue channel slot opening. (Design by our Founder & Chairman of European Armour Union Pte Ltd - Top Defence
Scientist of Singapore) |
Partial animated Man Made Mega Sea Whirlpool Vortex Structure. When the red
door are close vortex will form, A calm sea wave for
business as usual when red door are opened. Picture above shows how Man
Made Mega Sea Whirlpool Vortex Caisson walls structure are installed which
sit on the seabed under the sea. The picture above shows Singapore capabilities at
building Caisson walls Intended to build 3 Man
Made Mega Whirlpool Vortex Structure on the south of Singapore (workable when
sea current run from west to East) & 4 Man Made Mega Whirlpool Vortex
Structure on the South East direction of Singapore (workable when sea current
run from East to the West). Other
Application: 1) Power
Generation using sea current 2) Normandy
coast line blockage to prevent amphibious landing 3) Install
near Coat line along Seoul & Taipei to prevent amphibious landing |