About us       Products      Services       Contact        Our Blog       Security Forces            Motorsports             News & EventsThe front wind tunnel will continue to push F15SG higher (or maintains altitude) on it wings lift force (artificial wing lift force from front wind tunnel) as it take off from the back wind tunnel moving forward to the front.

 

The front wind tunnel has 25% more lifting power than the back wind tunnel which it mission is to afloat the F15SG plane only.
(Both Wind Tunnel diameter are at 18 meters each)

Design & Build by European Armour Union Pte Ltd.

                                                                       

7 Man Made Mega Sea Whirlpool Vortex can be installed on Singapore Shipping Route Blockage during outbreak of wars.

 

Man Made Mega Sea Whirlpool Vortex Submerged Structure had been developed.

 

 

 

 

 

Plan View - Fully Submerged Whirlpool Caisson Walls Structure build up on seabed 50m tall, 1.5 km wide & centre of curve wall has a 300m wide channel and added red top gate 25m depth which allow vortex to form when it seal up half of the blue channel slot opening. (Design by our Founder & Chairman of European Armour Union Pte Ltd - Top Defence Scientist of Singapore)

 

 

  

Partial animated Man Made Mega Sea Whirlpool Vortex Structure. When the red door are close vortex will form, A calm sea wave for business as usual when red door are opened.

 

 

Picture above shows how Man Made Mega Sea Whirlpool Vortex Caisson walls structure are installed which sit on the seabed under the sea.

 

The picture above shows Singapore capabilities at building Caisson walls

 

 

Intended to build 3 Man Made Mega Whirlpool Vortex Structure on the south of Singapore (workable when sea current run from west to East) & 4 Man Made Mega Whirlpool Vortex Structure on the South East direction of Singapore (workable when sea current run from East to the West).

 

Other Application:

1) Power Generation using sea current

2) Normandy coast line blockage to prevent amphibious landing

3) Install near Coat line along Seoul & Taipei to prevent amphibious landing